Spring 2002

Vol. 7, No. 1, pp. 1-64  
  pp. 6-15 Construction Ph.D. level education. Pace, C. B. , and  Danali, S.
 
  pp. 16-30 Simulation gaming in construction: ER, the equipment replacement game. Nassar, K.
 
  pp. 31-44 Analysis of a type I differing conditions claim: An empirical study to determine which proof element is most frequently disputed and which party interest most often prevails. JensenJr., D. A.
 
  pp. 45-57 Dynamic prediction of traffic flow and congestion at freeway construction zones. Jiang, Y.
 
  pp. 58-62 A general characterization of pavement system failures, with emphasis on a method for selecting a repair process. Woods, W. R. , and  AdcoxJr., J. W.